RESPONSIVE GLAZING SOLUTIONS FOR HOTELS TO MAINTAIN AESTHETICS


DAMAGED LIFT LOBBY GLASS AND HOTEL LOBBY MIRROR REPLACEMENT
Upon completion of site measurements and coordination with the hotel for sensitive equipment such as the fire alarm, replacements for a total of 14 glass or mirror panels were completed within 11 days.
LOCATION
Joo Chiat hotel
SPECIFICATIONS
- 5mm clear glass with black coating for lift lobby
- 6mm bronze mirror for hotel lobby
DAMAGED BALCONY RAILING REPLACEMENT
Upon completion of site measurements and coordination with the hotel to block off the affected room and to cordon off the area on the first floor, dismantling and installation of the glass balustrade was completed within 4 hours.
LOCATION
Jalan Sultan hotel
SPECIFICATIONS
17.52mm clear laminated glass




DAMAGED BALCONY RAILING REPLACEMENT
Upon completion of site measurements and coordination with the hotel to block off the affected room and to cordon off the area on the first floor, dismantling and installation of the glass balustrade was completed within 4 hours.
LOCATION
Jalan Sultan hotel
SPECIFICATIONS
17.52mm clear laminated glass







DAMAGED MIRROR REPLACEMENT
Mirrors may sometimes crack or oxidize due to thermal stress or moisture, potentially causing safety or brand imaging concerns. Perwira’s speedy response to our clients ensures mirror replacements can be completed within 1 week upon order confirmation and site measurement.
LOCATION
Local hotel chains
SPECIFICATIONS
- 5mm clear mirror
- Sticker backing